Big Lift where We Inspected the DP's day or night in Tales of the Jointed Track

  • July 20, 2018, 4:13 a.m.
  • |
  • Public

The video shows where we used to inspect the DP’s ( Distributive Power ). DP’s are a “helper” so to speak controlled by a dedicated radio frequency assigned to the railroad. The engineer controls these from the lead unit. You’ll see the overpass and the curve in the background. During the day you’d spot the DP’s and call out 20 cars, as they passed under Titan Parkway 10 cars and then five and stop. At night you’d look for the step lights, if they were on, or by the sound. It would place them in the general area. Some overshot. Not bad, unless we had to add water. The water trailer is gone. The troubleshooter position has been eliminated, so they are now basically on their own. I’ll try to get a pic of the water trailer I know I have one somewhere.

https://1drv.ms/v/s!AgV2J1zT9nylqiV9cgGd3ELosocS

 photo 004_zpsg8vwszac.jpg
the water trailer
 photo 005_zpssezbhxjq.jpg
a second pic The road closed sign this is where Titan road crossed the Santa Fe and Rio Grande mains at one time. Titan Parkway bridge eliminated the crossings.


Loading comments...

You must be logged in to comment. Please sign in or join Prosebox to leave a comment.